Slabs

A collection page of Goby Walnut Products, Inc

categoryLinked from the homepage
Products
4.9K
Active ads
0
Depth
Click depth 1
Published
2017/10/17

About

All of the slabs below are in the process of air drying. Most slabs require 2 summers of air drying before they are ready for the kiln. Typically, slabs take 12 weeks in the kiln after air drying properly. Have a short lead time? Check out our kiln dried slabs ! Need another angle, we may have it- call and check. Please call to make an appointment to view slabs in person. To order slabs, please call us to go over status of slabs and shipping details. 503-477-6744.

On-page SEO

Title tag (72)

Live Edge Wood Slabs – Goby Walnut Products, Inc

Meta description

All slabs are in the process of air drying. Have a short lead time? Check out our kiln dried slabs! International Shipping Available. Learn More.

H1

Slabs

Canonical

https://gobywalnut.com/collections/slabs

Robots

index

Copy

97 words

Sign in to see the ads landing on this page and its link graph.

Sign in to see all findings